1. There should be a good bonding force between the plating layer and the base metal, between the plating layer and the plating layer;
2. The coating should be finely crystallized, smooth and uniform in thickness;
3. The coating should have a specified thickness and as few pores as possible;
4. The plating layer should have the specified indicators, such as brightness, hardness, conductivity, etc.;
5. The plating time and the temperature of the plating process determine the thickness of the plating layer. The ambient temperature is -10℃~60℃;
6. The input voltage is 220V±22V or 380V±38V;
7. The maximum operating noise of water treatment equipment should not be greater than 80dB(A);
8. The relative humidity (RH) should not be greater than 95%;
9. The COD content of raw water is 100mg/L~150000mg/L.